Skip to content

Si-Tec® ceramic shoes reduce wear part cost 40%

Location
USA
Feed material
Clay with high silica content
Equipment
Cemco 96

Parts

  • 0052611HS ceramic shoe
Photography — People

A shoe change-out in progress on a VSI — two people, the table open, the old set on the deck. This story is about the four hours the change takes, so the frame should show the work.

Measured on site

Si-Tec® shoe wear life provided a 2.25× improvement.

Cemco 96 — one machine, one feed material

The record

Read the baseline first.

The improvement only means something against what the machine was doing before it. Published 23 January 2020.

Baseline

What the customer was running

  • Standard chrome four-shoe table on a Cemco 96
  • Standard chrome shoes last four shifts of 8 hours
  • Shoe change-outs take four hours with two staff
  • Shoe cost per ton of $0.095 per set

Objective

What the change was meant to do

  • Installation of Spokane Industries Si-Tec® ceramic shoes
  • Double wear life from standard chrome shoes
  • Decrease change time and cost

Results

What was measured

  • Si-Tec® wear life of nine shifts of 8 hours (2.25× improvement)
  • Change-outs reduced from every 4 days to every 9 days (2.25× improvement)

Value delivered

What it was worth to the operation

  • Shoe cost per ton reduced from $0.095 to $0.057 (40% improvement)
  • Reduction in change-outs leads to improved safety and increased machine uptime

Read this too

What these numbers are not.

A wear part that lasts twice as long in Tennessee sandstone can do nothing of the kind in Idaho RAP, because the rock, the tonnage, and the geometry are different. Nothing here is a warranty and nothing here is a specification. What SI will do is measure your part in your circuit and put the numbers against the ones you have now.

How Si-Tec® is specified

Send us what your part does now.

Service life in hours or tons, the feed material, and photographs of where the wear actually is. That is enough to say whether Si-Tec® changes anything in your circuit.

Technical review within 48 hours